Outdoor Living Today SSGS812 Bedienerhandbuch Seite 20

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 35
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 19
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 20
48. Where Ridge Boards meet, align together so they are
flush with each other and secure them with 12-1 1/4” screws.
To completely secure Ridge Boards, place 4 - 1 1/4” screws into
any of the remaining Metal Ridge Board Connectors holes.
Complete both sides.
49. With both Short and Long Rafters in correct
alignment, secure Gable framing to both outside
rafters with 7 - 2” screws per side at top and with 5
additional 2” screws into wall top plates at bottom.
Offsetting Metal Ridge Board Con.
Important: - If Gable framing does not
line up with Rafters, remove temporary 2”
screws from gable framing. Re-align
gable and secure with 8 - 2” screws total.
Complete
both Gables.
91”wide
51.Prior to securing the Long Rafter Side, make sure walls are aligned correctly. Have two helpers
push on both side walls at the top of wall from the outside until wall side plates are 91” apart from the
inside. When walls correctly aligned, attach long rafters using 3” screws as per Step 50. Position a
Roof Gusset on the Center Rafter. Leave a 1” gap from the top side of the rafter.
Leave 1” gap
to top of rafter
Roof Gusset
Center Rafter
50. Secure Short Rafters to Top Wall Framing
with one 3” screw per rafter. Screw through
Wall Frame at an angle.
Seitenansicht 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 34 35

Kommentare zu diesen Handbüchern

Keine Kommentare